皇冠体育寻求亚洲战略合作伙伴,皇冠代理招募中,皇冠平台开放会员注册、充值、提现、电脑版下载、APP下载。

首页体育正文

博彩‘cai’平“ping”台推「tui」荐【jian】(www.99cx.vip)_Kelana Jaya LRT line to increase train frequency by August, says transport minister

admin2022-06-207

博彩平台推荐www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。博彩平台推荐上最新博彩平台推荐登录线路、博彩平台推荐代理网址更新最快。博彩平台推荐开放皇冠官方会员注册、皇冠官方代理开户等业务。

,Transport Minister Dr Wee Ka Siong says all repairs on carriages servicing the Kelana Jaya LRT line will be completed in November. – The Malaysian Insight file pic, June 16, 2022.

TRAIN frequency for the Kelana Jaya LRT line is expected to improve by August, Transport Minister Dr Wee Ka Siong said. 

He said it would be improved from eight minutes to at least five minutes after more damaged carriages are repaired.

“We have identified the cause for the damage and now repairs need to be done. So this August would be the interim progress, the frequency would be at five minutes,  and in November we will be able to complete all repairs,” he told a media conference today. 

Earlier, Wee had accompanied Prime Minister  I *** ail Sabri Yaakob for a ride on the Putrajaya Phase 1 Mass Rapid Transit (MRT) line from the Kampung Batu station to Sri Damansara Sentral.

Wee said the Transport Ministry (MOT) had set the August and November target because a lot of preventive maintenance had to be carried out due to safety factors.

MOT apologises to all affected LRT users for the inconvenience, Wee said, adding that the delays were unavoidable in the interest of safety. 

“If we were to keep using (problematic trains) and there are risks… we would not want any untoward incidences,” he said. 

On May 22, Prasarana Malaysia Bhd said it had set up a committee after one of its trains on the Kelana Jaya Line stalled two days earlier due to a brake caliper hydraulic leakage, affecting about 22,100 passengers. – Bernama, June 16, 2022.


转载说明:本文转载自Sunbet。

网友评论